Explore the roadmap for re-integrating support for classic E1/T1 TDM based BTSs in the Osmocom Cellular Infrastructure stack in this 17-minute conference talk. Learn about the challenges faced when introducing the split BSC/MSC architecture and how it affected the support for traditional base transceiver stations. Gain insights into the planned steps to properly restore this functionality within the Osmocom ecosystem, as presented by Harald Welte.
Overview
Syllabus
Re-introducing E1/T1 to post-NITB Osmocom
Taught by
media.ccc.de