Completed
Mod-08 Lec-38 Coastal structures and environmental management
Class Central Classrooms beta
YouTube videos curated by Class Central.
Classroom Contents
Port and Harbour Structures
Automatically move to the next video in the Classroom when playback concludes
- 1 Mod-01 Lec-01 Layout of ports
- 2 Mod-01 Lec-02 Continuation of layout of ports
- 3 Mod-01 Lec-03 Visakhapatnam port
- 4 Mod-01 Lec-04 Ships and size of ships
- 5 Mod-01 Lec-05 Port planning
- 6 Mod-01 Lec-06 Harbour layout
- 7 Mod-02 Lec-07 Site characteristics & navigation channel
- 8 Mod-02 Lec-08 Bathymetric survey
- 9 Mod-02 Lec-09 Tide, surge, tsunami and wave
- 10 Mod-02 Lec-10 Wave rose diagram
- 11 Mod-03 Lec-11 Breakwater
- 12 Mod-03 Lec-12 Design of breakwater --part-1
- 13 Mod-03 Lec-13 Design of breakwater --part-2
- 14 Mod-03 Lec-14 Berm breakwater
- 15 Mod-03 Lec-15 Dredging & methods of disposal
- 16 Mod-04 Lec-16 Berthing structures modelling
- 17 Mod-04 Lec-17 Berthing structures --analyses
- 18 Mod-04 Lec-18 Loads
- 19 Mod-04 Lec-19 Types of berthing structures
- 20 M0d-04 Lec-20 Design of berthing , structures-1
- 21 Mod-04 Lec-21 Design of offshore berthing , structures-1
- 22 Mod-04 Lec-22 Estimation of mooring, berthing and seismic forces
- 23 Mod-04 Lec-23 Estimation seismic forces
- 24 Mod-4 Lec-24 Active and passive earth pressure and differential water pressure
- 25 Mod-04 Lec-25 Load combinations and design
- 26 Mod-04 Lec-26 Fenders
- 27 Mod-04 Lec-27 Mechanical handling system
- 28 Mod-05 Lec-28 Single buoy mooring and open sea jetty-part1
- 29 Mod-05 Lec-29 Single buoy mooring and open sea jetty-part 2
- 30 Mod-05 Lec-30 Slipway, drydock,floating dock,shiplift
- 31 Mod-06 Lec-31 Soil structure interaction
- 32 Mod-06 Lec-32 Calulation of fixity depth
- 33 Mod-06 Lec-33 Pile load test
- 34 Mod-06 Lec-34 Ground improvement techniques
- 35 Mod-06 Lec-35 Analysis of pile with spring support
- 36 Mod-07 Lec-36 UPV,Half cell potential, Low high Integrity Test
- 37 Mod-07 Lec-37 Mooring Dolphin at KPT
- 38 Mod-08 Lec-38 Coastal structures and environmental management
- 39 Mod-08 Lec-39 BOQ and Cost Estimate
- 40 Mod-08 Lec-40 Proposed Mega Terminal Chennai
- 41 Mod-08 Lec-41 Preliminary Project Report on Shipyard
- 42 Mod-08 Lec-42 Procedures & clearances before implementation of a project
- 43 Mod-08 Lec-43 Detailed project report
- 44 Mod-08 Lec-44 Environmental studies of a project -
- 45 Mod-09 Lec-45 Design of pile
- 46 Mod-10 Lec-46 Design and construction of diaphragm wall
- 47 Mod-11 Lec-47 Emprical relationship between spt and several soil properties
- 48 Mod-11 Lec-48 Model studies for a deep water port_case study