Completed
The game plan
Class Central Classrooms beta
YouTube videos curated by Class Central.
Classroom Contents
An Outdoor LED Installation with Neon Rope Tube
Automatically move to the next video in the Classroom when playback concludes
- 1 Intro
- 2 The game plan
- 3 3D-printed parts used
- 4 Removing old light fixture
- 5 Mounting new enclosure
- 6 Mounting components in the enclosure
- 7 WLED controller - ESP8266 vs. ESP32
- 8 Cutting the neon rope tubing
- 9 Cutting and preparing the LED strips
- 10 Pulling LEDs through the tubing
- 11 Final tube design and labeling
- 12 Install options for the Shelly 1PM relay
- 13 Review of mounted enclosure and first test
- 14 Challenges with the neon rope tube
- 15 Midpoint review and redesign
- 16 Final project overview
- 17 Night time review
- 18 Automations and delay comparisons
- 19 Final conclusions